Client: SPECIAL WASTE TREATMENT COMPANY (NON-FERROUS METALS AND ELECTRONIC WASTE)


Location: PENGIS - BELGIUM


Application sector: WASTE TREATMENT PLANT

Objectives

Solution

Once the preliminary study had been approved, M.M.’s technical department developed the project in collaboration with the company responsible for the electromechanical works. Through videoconference exchanges, the detailed aspects were refined thanks to a 3D study of the FRP structures integrated with the equipment. The vertical structures were selected so as to be equipped with height-adjustable feet, while the bracing system was designed to minimize encumbrance and ensure adequate stiffness, even during handling and installation. The platforms were manufactured in fully preassembled modules at M.M.’s plant, with covered grating flooring fitted with laminated kick plates. The compatibility achieved between the digital design and the precise preassembly made it possible to integrate the structure with the equipment and carry out installation without unforeseen issues. The packaging method was also studied to optimize the space required for loading onto standard-sized vehicles, avoiding the need for special transport or multiple deliveries.

Work with us

Do you want to join the M.M. team? We are always looking for new talent!