Client: TURIN AIRPORT


Location: TURIN - ITALY


Application sector: DELIMITATION OF THE DE-ICING AREA WITHIN THE AIRCRAFT MANOEUVRING AREA

Objectives

Solution

M.M. supplied FRP gratings in the required colours for the construction of jet blast deflectors ensuring safety, durability and maintenance-free operation. To create the reinforced concrete ballast on which the structural profiles were installed to support the FRP panels, M.M. supplied the installer with the technical layouts to correctly position the mechanical fastenings. The profiles were joined so that they facilitate handling on site and absorb any geometric tolerances associated with the reinforced concrete ballast. FRP panels were fastened on the profiles following an in-depth study to determine not only the percentage of the open and closed area based on the tilt angle, but also the angle of air flow deflection. All the fastenings were sized to withstand the action of the planes’ jet engines. Lastly, the jet blast deflectors were tested with the support of an airline which provided a plane to simulate the manoeuvres on the de-icing pad.

Work with us

Do you want to join the M.M. team? We are always looking for new talent!