Client: DUCHENE S.A.


Location: LIEGI - BELGIUM


Application sector: MAINTENANCE LINES FOR RAILWAY COACHES

Objectives

Solution

The M.M. Technical Team developed a parapet system fully compatible with the project’s specifications and restraints. The choice of the FRP solution allowed to significantly reduce the weight of the modules, thus resulting in an easier handling while ensuring a proper protection from falling in the workspace. The project has been realized as a completion of the gangways’ steel structure. For this reason, it hasn’t been possible to modify the circular shaped accommodation holes in order to install the standard square-shaped FRP posts. To solve this problem, M.M. developed a special galvanized steel adaptor, designed and built to realize an optimal fitting with the existing holes and ensuring an effective connection between the sections. The parapet modules have been supplied preassembled; the packing has been optimized in order to reduce transport costs and ease the installation process.

Work with us

Do you want to join the M.M. team? We are always looking for new talent!