Client: MM SPA


Location: MILANO - ITALY


Application sector: WASTE WATER TREATMENT PLANT

Objectives

Solution

M.M. designed and installed handrails, ladders and stairways, open mesh flooring and covers, as well as non-slip FRP coverings, ensuring over 20 years of maintenance-free durability in humid environments. To manage the entire process, M.M. put together a multi-departmental team, which also performed on-site surveys and prepared a detailed 3D design of the FRP solutions. The delivery method was adapted on a case-by-case basis, depending on site accessibility. The installation, planned in collaboration with the client, minimised intervention times and service interruptions, allowing plant upgrade works to be performed at the same time. M.M.’s Project Manager coordinated activities and document management, including safety aspects, in compliance with the procedures outlined in the contract.