Client: MARKET LEADER IN THE WASTE WATER MANAGEMENT INDUSTRY IN HUNGARY


Location: JÁSZFÉNYSZARU - HUNGARY


Application sector: WASTE WATER TREATMENT PLANT

Objectives

Solution

M.M. designed and produced new FRP structures, keeping in mind not only the safety of workers during installation and use - ensuring structural resistance to the elements while respecting the deformation limits in accordance with UNI EN ISO 14122 norms - but also the required flexibility for an easier adaptation to the site. The structures were designed, in fact, for different areas of the plant; in particular for the cyclator building M.M. produced parapets and a tailormade staircase. Therefore, the staircases have been designed as prefabricated modules, in order to reduce on-site operations. On the other hand, the parapets have been supplied in a “kit” mode, with readymade vertical posts and horizontal bars to be cut on site in order to obtain a tailor-made solution. The installer is part of M.M.’s qualified network: a group of companies that are able to install our FRP structures in an excellent way thanks to our technicians’ support, who assist them during every step of on-site installation. In fact, for this project, M.M. provided not only the 2-D detail drawings supported by structural calculations, especially concerning the custom-made system which supports the staircase, but also remote support for the perfect installation of the parapets. Concerning the gratings, their concave antiskid meniscus top features a R13 V10 level of the DIN 51130 norm: therefore, the gratings are certified as non-slippery surface, even in wet conditions.

Work with us

Do you want to join the M.M. team? We are always looking for new talent!